There is an angled wall which conceals pipes and wires. It is right behind the toilet. It is at the opposite end from the bathroom door. I was trying to figure out how to treat this one foot surface with regard to the faux subway tile painting. I started out just continuing the normal pattern around with the two yellow rows. It looked awkward. Then it hit me. This is just paint. I don’t have to order or cut special tiles. I only need to measure, draw and paint! The first thing I decided was to move the clock onto this wall and paint it with Rustoleum’s “Hammered” galvanized look paint. It is just a $10 clock with a cheesy, faux wood frame. Next, I took the yellow and framed a large section over the toilet with 3″ x 6″ tiles and filled it in with blue and shrimp checkerboard 3″ x 3″ tiles. I hung the clock at an appropriate height on this wall. This freed up the spot where the clock had been for a cartoon tile portraying Woodstock.
A couple of the guys who work at the State Store have been following my progress. I ran into one of them at the grocery store and I told him about the cartoon characters I had added. He asked me if my bathroom would pass true steampunk muster; if Bruce Rosenbaum or Damien McNamara would approve. I replied, probably not. This is just a poor man’s version. Plus the faux, subway tiles, with the cartoon accents, are really more postmodern. So what we have here is Steampunk Postmodern Fusion. My grandchildren like it! It’s bright and cheery. It keeps me from playing on the freeway, as they used to say. Who knew this guy was so design literate? Kudos!
Next to the toilet is the radiator. I spray painted it with another of Rustoleum’s new paints: Sienna Mist. It was true to its name. The overspray left a fine coating over the entire floor of the bathroom and the lower two feet of the walls all around. Thankfully, most of it came off with just warm water, a rag and elbow grease. This photo doesn’t do it justice. It has a copper or bronze-like metallic sheen.
I’m into the home stretch now. I have to finish the subway tile lining here and there and four or five more cartoons. I have to paint the clawfeet of the tub and perhaps the tank and seat of the toilet. That’s right. I still have to fabricate and hang the copper tubing curtain rod for the window valance, and repaint the crates. No rest for the wicked.